blonde poker forum
Welcome, Guest. Please login or register.
June 26, 2025, 10:49:43 PM

Login with username, password and session length
Search:     Advanced search
2261837 Posts in 66597 Topics by 16985 Members
Latest Member: Going south
* Home Help Arcade Search Calendar Guidelines Login Register
+  blonde poker forum
|-+  Poker Forums
| |-+  Live Tournament Updates
| | |-+  DTD New Year Special £150,000 GTD Deepstack: Day 2
0 Members and 1 Guest are viewing this topic. « previous next »
Pages: 1 ... 19 20 21 22 [23] 24 25 26 27 ... 33 Go Down Print
Author Topic: DTD New Year Special £150,000 GTD Deepstack: Day 2  (Read 100744 times)
rfgqqabc
Hero Member
*****
Offline Offline

Posts: 5369


View Profile
« Reply #330 on: January 06, 2013, 10:41:06 PM »

while we are waiting for final - anyone have any suggestions on how we avoid late finishes like this in future, options are;

1. cap runners at the GTE ie. 500 max for £150K, turn people away above the 500
2. 12pm starts day 1 and day 2
3. take out 4-5 levels
4. reduce 40 min clock to 35 mins
5. reduce chips to 20k

etc etc

Cheers Rob

I would say leave day 1's maybe play an extra level and then start at 12 on the Sunday. Shorter breaks would also work. 20 min breaks are too long in my opinion have 5-10 min breaks and that is more than sufficient. I believe the breaks are 20 mins now and there are 4 on day 1? so making these 10 mins long would save 40 mins and would allow for an extra level? Starting at 12 on the Sunday and having shorter breaks mean that even with 700 odd runners it could be finished by 2-3 which in my opinion is not to late

Personally I hate the 20 minute breaks but I understand completely why they have them.

There's a bunch of dealers working at the place who all need a break as well. No way this can change much at all unless they risk bringing in loads of extras so they can be rotated.


Breaks were 15 minutes this time, think they have already dropped from 20.  Am I going mad?

20-20-15-20 right? Or something like that 1A, 1B it certainly had 20 min one first...
Logged

[21:05:17] Andrew W: you wasted a non spelling mistakepost?
[21:11:08] Patrick Leonard: oll
c4ught
Sr. Member
****
Offline Offline

Posts: 364


View Profile
« Reply #331 on: January 06, 2013, 10:41:14 PM »



What kind of time do you "expect" a deepstack to be finishing Tighty?

3am latest? Reasonable enough. Most players will have work on a Monday at a £300 buy in level, and yes those who final will have a great payday but they've still got to go to work tomorrow!

Yes its an exceptional month in terms of runners and therefore extremely difficult to fine tune a structure and times in advance

Matt's idea about day 2 above is a good one

3am definitely reasonable. Starting day 2 early seems like the easiest option for next month. Offers a chance to see what the numbers are.
Logged
kinboshi
ROMANES EUNT DOMUS
Administrator
Hero Member
*****
Offline Offline

Posts: 44239


We go again.


View Profile WWW
« Reply #332 on: January 06, 2013, 10:41:34 PM »

while we are waiting for final - anyone have any suggestions on how we avoid late finishes like this in future, options are;

1. cap runners at the GTE ie. 500 max for £150K, turn people away above the 500
2. 12pm starts day 1 and day 2
3. take out 4-5 levels
4. reduce 40 min clock to 35 mins
5. reduce chips to 20k

etc etc

Cheers Rob


Simplest tweak is keep Day 1a as is, but move Day 1b and Day 2 to 12 o'clock start.

Obviously logistical issues for the club, but that helps the players.
Logged

'The meme for blind faith secures its own perpetuation by the simple unconscious expedient of discouraging rational inquiry.'
BorntoBubble
Hero Member
*****
Offline Offline

Posts: 5887



View Profile
« Reply #333 on: January 06, 2013, 10:41:54 PM »

Early starts are best idea. This would mean a midnightish finish Saturday and a midday start Sunday. Then a 3ish finish Monday morning. Seems fine to me.

I'd advocate shortening the stock break to 15mins (leg stretch, phone home, spend a penny) and having an hour dinner break. You only have two roulette tables and a couple of blackjack tables. There are only so many people out of 500 who can get to them to do their brains, no matter how long a break you have Smiley





no dinner break please! not needed! If your hungry and dont want to eat in the club pack some sandwiches! hour dinner breaks are also not good for the club as i bet more people will go elsewhere for food.


Im not a fan of the early start on a friday back to the days of work fact. Most people can slope of early on a friday so a 2pm start is not that bad as people can get there by 4-5 if you make it 12 people will therefore need a day of work to play
Logged

"ace high"

http://plascolwyn.co.uk/ - 9 Bed Self Catering Holiday let in Snowdonia, North Wales Pm for more details.

Follow me on Twitter https://twitter.com/CalMorgan7
c4ught
Sr. Member
****
Offline Offline

Posts: 364


View Profile
« Reply #334 on: January 06, 2013, 10:43:16 PM »

Early starts are best idea. This would mean a midnightish finish Saturday and a midday start Sunday. Then a 3ish finish Monday morning. Seems fine to me.

I'd advocate shortening the stock break to 15mins (leg stretch, phone home, spend a penny) and having an hour dinner break. You only have two roulette tables and a couple of blackjack tables. There are only so many people out of 500 who can get to them to do their brains, no matter how long a break you have Smiley





no dinner break please! not needed! If your hungry and dont want to eat in the club pack some sandwiches! hour dinner breaks are also not good for the club as i bet more people will go elsewhere for food.



+1
Logged
jakally
Hero Member
*****
Offline Offline

Posts: 2003



View Profile
« Reply #335 on: January 06, 2013, 10:43:24 PM »

while we are waiting for final - anyone have any suggestions on how we avoid late finishes like this in future, options are;

1. cap runners at the GTE ie. 500 max for £150K, turn people away above the 500
2. 12pm starts day 1 and day 2
3. take out 4-5 levels
4. reduce 40 min clock to 35 mins
5. reduce chips to 20k

etc etc

Cheers Rob

I think an early start on Fridays would be bad. It worked out ok this month, as a chunk of people were still off work, but normally it wouldn't work so well.
35 minute levels is fine by me. Not ideal, but better than taking levels out.

12 pm start on Saturday, so that you can start earlier Sunday, would probably help.

Rather than change too much though, it's likely that next month (and thereafter) won't be quite as busy as this one - January is a funny month with people off work, desperate to get out the house after 2 weeks of food & drink etc....
Logged
StuartHopkin
Hero Member
*****
Offline Offline

Posts: 8145


Ocho cinco


View Profile
« Reply #336 on: January 06, 2013, 10:44:43 PM »

12pm starts defo best option

Oh and please ban those pathetic electric cigarettes!
Logged

Only 23 days to go until the Berlin Marathon! Please sponsor me at www.virginmoneygiving.com/StuartHopkin
T8MML
Sr. Member
****
Offline Offline

Posts: 559


View Profile
« Reply #337 on: January 06, 2013, 10:45:31 PM »

while we are waiting for final - anyone have any suggestions on how we avoid late finishes like this in future, options are;

1. cap runners at the GTE ie. 500 max for £150K, turn people away above the 500
2. 12pm starts day 1 and day 2
3. take out 4-5 levels
4. reduce 40 min clock to 35 mins
5. reduce chips to 20k

etc etc

Cheers Rob


12 - 12.30 start would be cool but might crush the Internet "don't surface till 4pm" brigade Smiley

I'd be interested in what five minutes could do to the dynamic but don't think that could harm.

Everything else mate is spot on!


Tim
Logged

if the snow is yellow - don't eat it!
kinboshi
ROMANES EUNT DOMUS
Administrator
Hero Member
*****
Offline Offline

Posts: 44239


We go again.


View Profile WWW
« Reply #338 on: January 06, 2013, 10:46:03 PM »

12pm starts defo best option

Oh and please ban those pathetic electric cigarettes!

Agree, except for the Friday start. As others have said, people can get away from work for the 2pm start, but might struggle for a 12:00 start on the Friday.  Saturday and Sunday can start at 12 o'clock though.

Logged

'The meme for blind faith secures its own perpetuation by the simple unconscious expedient of discouraging rational inquiry.'
FUN4FRASER
Hero Member
*****
Offline Offline

Posts: 2249



View Profile
« Reply #339 on: January 06, 2013, 10:47:11 PM »

12pm start would work .....

With the blind structure been so good people can have the option to late reg  4 or 5 hours after the start and still have a playable stack (as the 70/80 waiting to be seated found out on Saturday )
Logged
George2Loose
Hero Member
*****
Offline Offline

Posts: 15127



View Profile
« Reply #340 on: January 06, 2013, 10:47:18 PM »

Please don't change the structure.

20k stack seems a good solution
Logged

Ole Ole Ole Ole!
BorntoBubble
Hero Member
*****
Offline Offline

Posts: 5887



View Profile
« Reply #341 on: January 06, 2013, 10:47:29 PM »

12pm starts defo best option

Oh and please ban those pathetic electric cigarettes!


+1 these tilt me not sure why i think its every 2 seconds seeing a puff of smoke in the air and being 21 i don't remember the days of smoking indoors!
Logged

"ace high"

http://plascolwyn.co.uk/ - 9 Bed Self Catering Holiday let in Snowdonia, North Wales Pm for more details.

Follow me on Twitter https://twitter.com/CalMorgan7
FUN4FRASER
Hero Member
*****
Offline Offline

Posts: 2249



View Profile
« Reply #342 on: January 06, 2013, 10:48:00 PM »

Please don't change the structure.

20k stack seems a good solution

....and keep the structure
Logged
Czyz29
Jr. Member
**
Offline Offline

Posts: 84



View Profile
« Reply #343 on: January 06, 2013, 10:48:40 PM »

while we are waiting for final - anyone have any suggestions on how we avoid late finishes like this in future, options are;

1. cap runners at the GTE ie. 500 max for £150K, turn people away above the 500
2. 12pm starts day 1 and day 2
3. take out 4-5 levels
4. reduce 40 min clock to 35 mins
5. reduce chips to 20k

etc etc

Cheers Rob


Simplest tweak is keep Day 1a as is, but move Day 1b and Day 2 to 12 o'clock start.

Obviously logistical issues for the club, but that helps the players.

Yeah I would just say start day 2 at 12pm, and eliminate one level. Job done
Logged

Finally make a final after freerolling every tournament []
MLHMLH
Sr. Member
****
Offline Offline

Posts: 701


View Profile
« Reply #344 on: January 06, 2013, 10:51:26 PM »

while we are waiting for final - anyone have any suggestions on how we avoid late finishes like this in future, options are;

1. cap runners at the GTE ie. 500 max for £150K, turn people away above the 500
2. 12pm starts day 1 and day 2
3. take out 4-5 levels
4. reduce 40 min clock to 35 mins
5. reduce chips to 20k

etc etc

Cheers Rob

please don't change anything but the start times
Logged
Pages: 1 ... 19 20 21 22 [23] 24 25 26 27 ... 33 Go Up Print 
« previous next »
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.21 | SMF © 2015, Simple Machines Valid XHTML 1.0! Valid CSS!
Page created in 0.095 seconds with 20 queries.